UP train speed
25.4 mph
Lucerne, Colorado
No public contactThis is primarily a transload facility
City and subdivision only
Contextual Intelligence
These signals are limited to the railroads and geography connected to this facility, so the page stays operationally useful instead of turning into a generic feed dump.
UP train speed
25.4 mph
UP terminal dwell
19.8 hrs
Latest system-level dwell reading from the operating metrics feed.
UP revenue
$6,150M
Q3 2025 operating ratio 58.7%.
UP top commodity
Containers
62,562 weekly carloads in the latest commodity breakdown.
Record feedback
Use this when a public record looks wrong, stale, duplicated, or over-confident. Every report goes to moderation first so curation can review the evidence before anything public changes.
Listing Management
Claims, verification requests, and listing edits do not publish directly. Every submission enters moderation first, so public claimed or verified states only appear after review.
Current public status
No moderated claim or verification state is currently published for this listing.
Inquiry Target
Lucerne, Colorado
Railcar Storage · Physical Facility
Railroads: UP
Windsor, Colorado
BNSF · UP
Railcar Storage · Storage Yard
500 cars
Current public source or verification support is not disclosed on this record.
Carr, Colorado
UP
Railcar Storage · Storage Yard
100 cars
Current public source or verification support is not disclosed on this record.
Lucerne, Colorado
Lucerne, Colorado
30 cars
The Surface Transportation Board’s Office of Environmental Analysis (OEA) today issued a Final Environmental Assessment (Final EA) for the proposed construction of approximately six miles of new rail line in Mesa, Arizona by Union Pacific Railroad Company (UP). [Click for full press release.]
The STB today announced a unanimous decision finding that the major merger application filed by Union Pacific (UP) and Norfolk Southern (NS) on December 19, 2025 is incomplete. [Click for full press release.]